A Cutting Edge Tool Designed For Hydropower Plants To Manage Operations

cover img for /path/to/save/9.png

In today’s fast-paced business world, effective project operation and management are critical for success. Whether you’re a small team tackling a startup venture or a large enterprise managing multiple complex projects, staying organized, meeting deadlines, and ensuring seamless collaboration can be challenging. That’s why we are thrilled to introduce our new Project Management System—an all-in-one solution designed to transform the way you manage operations.

POMM System (Project Operation/Maintenance Management System) is an empowering sustainable hydropower solution designed  to manage operations, report issues, moniter power generation, and track maintenance, ensuring effeciency and sustainability.

 

The Client-Side Features Includes:

 

Problems Reported

 

  • Lists reported issues with filters, categories, and timestamps.
  • Key columns include Problem Name, Status, and Category.

 

Reported Power Generation

 

  • Tracks daily power generation during morning, afternoon, and evening.
  • Highlights peak power data.

 

Discharge Report

 

  • Monitors water discharge in cubic meters per second (m³/s).
  • Provides data by time of day and daily maximum discharge.

 

NEA Shutdown History & Plant Tripping Shutdown History

 

  • Tracks NEA-initiated and plant tripping shutdowns with dates and durations.

 

 

Manager-Side Features:

 

Main Screen: Problem List

 

Categorized issue lists (e.g., Civil, Hydro Mechanical).

Clicking issues opens the Problem Report Form to log details and images.

 

Problem Reports:

 

Identified, InProgress, and Closed Reports: Displays the progress of issues through each stage.

 

Power Reports:

 

Power generation history with daily and monthly breakdowns.

 

Discharge Report History:

 

Displays historical water discharge data over time.

 

 

Features:

 

Power Report Charts: Displays monthly power generation based on selected year and month.

 

Problem Category Chart: Shows problems per category in a horizontal bar graph.

 

Discharge Report Charts: Shows Daily/Monthly discharge with average discharge for selected year and month.

 

Tentative Energy Chart: Compares Daily/Monthly energy generated vs. contracted energy.

 

Shutdown History Chart: Compares monthly shutdown durations by cause (Plant Tripping or NEA).

 

Tentative Revenue Chart: Compares tentative revenue vs. contracted revenue by month.

 

Problem Report Chart: Displays total problems by type.

 

 

Data Input:

 

Input Basic Data: Set efficiency, water levels, and transmission loss.

 

Contract Energy: Set monthly contract energy.

 

Cost Per Unit: Set annual energy cost per unit.