
In today’s fast-paced business world, effective project operation and management are critical for success. Whether you’re a small team tackling a startup venture or a large enterprise managing multiple complex projects, staying organized, meeting deadlines, and ensuring seamless collaboration can be challenging. That’s why we are thrilled to introduce our new Project Management System—an all-in-one solution designed to transform the way you manage operations.
POMM System (Project Operation/Maintenance Management System) is an empowering sustainable hydropower solution designed to manage operations, report issues, moniter power generation, and track maintenance, ensuring effeciency and sustainability.
The Client-Side Features Includes:
Problems Reported
- Lists reported issues with filters, categories, and timestamps.
- Key columns include Problem Name, Status, and Category.
Reported Power Generation
- Tracks daily power generation during morning, afternoon, and evening.
- Highlights peak power data.
Discharge Report
- Monitors water discharge in cubic meters per second (m³/s).
- Provides data by time of day and daily maximum discharge.
NEA Shutdown History & Plant Tripping Shutdown History
- Tracks NEA-initiated and plant tripping shutdowns with dates and durations.
Manager-Side Features:
Main Screen: Problem List
Categorized issue lists (e.g., Civil, Hydro Mechanical).
Clicking issues opens the Problem Report Form to log details and images.
Problem Reports:
Identified, InProgress, and Closed Reports: Displays the progress of issues through each stage.
Power Reports:
Power generation history with daily and monthly breakdowns.
Discharge Report History:
Displays historical water discharge data over time.
Features:
Power Report Charts: Displays monthly power generation based on selected year and month.
Problem Category Chart: Shows problems per category in a horizontal bar graph.
Discharge Report Charts: Shows Daily/Monthly discharge with average discharge for selected year and month.
Tentative Energy Chart: Compares Daily/Monthly energy generated vs. contracted energy.
Shutdown History Chart: Compares monthly shutdown durations by cause (Plant Tripping or NEA).
Tentative Revenue Chart: Compares tentative revenue vs. contracted revenue by month.
Problem Report Chart: Displays total problems by type.
Data Input:
Input Basic Data: Set efficiency, water levels, and transmission loss.
Contract Energy: Set monthly contract energy.
Cost Per Unit: Set annual energy cost per unit.